Stop retyping P&IDs. Send the RFQ straight from the drawing.

Import a DEXPI file, a P&ID PDF or a scan. Tags, materials and design data are read from the drawing, your engineer checks them, and they go to suppliers as complete RFQ lines. Nobody types a tag list again.

See P&ID to RFQ in 30 seconds

Engineering exports the P&ID as DEXPI and procurement imports it into ChemCapital, where tags, materials and design data come straight from the file, are reviewed and accepted, and become cost plan lines or draft RFQs that both teams can track on one drawing.

Your P&ID is finished. Every tag is in the model. So why is procurement retyping it?

Video transcript

Your P&ID is finished. Every tag is in the model. So why is procurement retyping it? Engineering exports DEXPI. Procurement drops it into ChemCapital. Tags, materials and design data come straight from the file. No AI guesswork. Procurement reviews and accepts. Each item becomes a cost plan line, or a draft RFQ. Engineers and buyers see every tag's status on one drawing. Make your procurement easier with ChemCapital.

Save the hours your engineers spend retyping drawings.

A P&ID already holds the equipment list. The work today is copying it out by hand, again and again, and that is where the time and the mistakes go.

Build the equipment list

By hand: Typed tag by tag from the drawing into a spreadsheet.

With ChemCapital: Read from the DEXPI file or the drawing and listed for review.

Add the specifications

By hand: Datasheets found in email and shared folders, then copied across.

With ChemCapital: Datasheet values are linked to the tag they describe.

Write the RFQ

By hand: The same data typed again into an email for each supplier.

With ChemCapital: Accepted tags are grouped into a package and sent as one RFQ.

Budget the scope

By hand: A separate estimate spreadsheet, built from the same list again.

With ChemCapital: The package goes into a cost plan as lines ready to price.

Handle a new revision

By hand: The drawings compared by eye and the list started again.

With ChemCapital: Only the new tags are added for review. Accepted ones stay accepted.

Report progress

By hand: A status meeting and a tracker nobody quite trusts.

With ChemCapital: The colour of each tag on the drawing.

See what is bought and what is still open, on the drawing itself.

Every tag is coloured by where it stands, from just read to ordered. Engineering and procurement look at the same sheet, so nobody has to ask whether the pump has been quoted yet. Select a tag to follow it.

FTPTFeedTo downstreamIllustrative drawing and dataT-100P-101AFT-102FV-102E-201R-301PT-301

Swipe the drawing sideways to see the rest.

  • To review
  • Accepted
  • RFQ sent
  • Quoted
  • Ordered

P-101A

Feed pump

Quoted

Read from the drawing

  • Centrifugal pump
  • 316L wetted parts
  • 12 m³/h at 4 bar

Where it stands

  1. Read from the drawing (done)
  2. Accepted by your engineer (done)
  3. Added to a package: Rotating equipment (done)
  4. RFQ sent to suppliers (done)
  5. Quotes received (done)
  6. Order placed (not yet)

Next: compare the quotes and award.

Catch the mistake at review, not at delivery.

A wrong material or a missed instrument costs little on a screen and a great deal once it is on a purchase order. Review is built in, and it is quick.

  • Nothing reaches a supplier unchecked. Every item read from a drawing waits for your engineer's decision before it can enter a package.

  • The sure reads go through together. Accept every confident read in one action, then spend your attention on the rest.

  • The doubtful ones are set apart. Where the reader was unsure, it says so and shows the alternatives it considered. Your engineer chooses.

  • Every decision is kept. Who accepted or rejected each item, and when, stays on the record.

Review: items read from the drawing

Illustrative

Illustrative review list of items read from a drawing
TagRead asReaderDecision
P-101ACentrifugal pumpSureReady to accept
E-201Shell and tube exchangerSureReady to accept
FV-102Control valveSureReady to accept
PT-301Pressure transmitter, or an indicator?UnsureNeeds your engineer

The three sure reads can be accepted in one action. The fourth waits for your engineer.

Complete specifications in. Comparable quotes out.

Each RFQ line carries the tag, the material and the design data from the drawing, so every supplier prices the same scope. Their quotes line up side by side, and a gap shows before the order is placed, not as an extra after it.

See how the quotes are compared

Start from the file engineering already has.

No template to fill in and no data to prepare. Three steps take you from a file to an RFQ.

  1. Import

    Drop in the files and watch them being read, page by page.

  2. Review

    Accept the tags in a table or on the drawing itself, and correct anything that needs it.

  3. Package and send

    Group accepted tags into a package, then send it as one RFQ or put it into a cost plan first.

What each file gives you

Download a sample DEXPI file
DEXPI 1.3 XML
Exported from your CAD system. Equipment, instruments, valves, nozzles and lines are read directly from the file's own data, with no AI interpretation.
P&ID as PDF, DXF or scan
Read by AI, scanned sheets included, and listed with a confidence level for your engineer to check.
Datasheets (PDF)
Key parameters are read and linked to the tag they describe, so the RFQ line carries the specification.
Equipment lists in Excel or CSV
Your columns are matched to tags and types. Import a revised list and only what changed comes back for review.
Not buying yet? Price the package in a cost plan first

Where it pays off first.

During FEED

Have the procurement scope ready while the design is still moving.

Import P&IDs as they are issued for review, and every tagged item is listed before the FEED report is finished.

Owner operators and FEED teams

On a tender

Price a client's package before the deadline.

Import the client's drawings and datasheets in one session and send RFQs to your equipment suppliers from the same list.

EPC contractors and engineering consultancies

On a revamp

Start the next expansion from the plant you already have.

Export the DEXPI model from your CAD system and use its equipment and instrument index as the starting point for the next RFQ.

Plant engineering and maintenance teams

Included in every agreement.

No separate licence and no per user fee. One agreement per company, sized to a band by your project activity; the band sets how many P&ID pages a year are included.

See full pricing

Project

500 P&ID pages a year

One site or one capital project at a time

Portfolio

2,000 P&ID pages a year

Several projects across a site or a region

Enterprise

Set per agreement

Several sites, or a regulated group

Your drawings are your intellectual property. They never train a model, and every accepted item keeps its review history.

  • ALCOA+ data integrity
  • GAMP 5 aligned
  • Complete audit trail
  • Encrypted in transit and at rest
  • MFA and SSO
Visit the Trust Centre

Common questions

More questions? Contact our team

Import a drawing and watch the tag list build itself.

Start a 14 day free trial with a drawing of your own, or use our sample DEXPI file. Prefer to see it first? Book a demo and bring a P&ID.

No credit card requiredFree to startCancel anytime