New · Engineering Costing & SourcingNew

Price complex plant projects in days,not weeks.

A structured engineering cost estimation tool built for process plants. Build CapEx budgets, reuse previous quotations, reprice transparently, and move directly from estimate into live supplier sourcing — all in one connected platform.

No credit card requiredFull costing access during trialAll your data stays yours

The problem

Engineering cost estimation is still done in spreadsheets.

Process engineers and CapEx teams spend weeks rebuilding estimates that already exist somewhere else — buried in old Excel files, email threads, and PDF quotations from previous projects.

Rebuilding cost estimates from scratch for every project

Reuse any previous quotation. Reprice it against current indices in seconds — not weeks.

Cost estimates buried in Excel files with no audit trail

Every price has a documented basis: source, date, normalization factors, and who changed it.

No clear picture of which line items are priced vs still exposed

A live cost dashboard separates firm quotes from indicative estimates — at a glance.

Chasing suppliers for budgetary quotes on every new project

Only request fresh quotes where you have no existing basis. Send them directly from the cost plan.

Cost range collapses to a single number and loses context

Every workspace shows a transparent cost range with contingency — tied to your FEED maturity stage.

No structured hand-off from estimating to procurement

Select any line items and convert them into live RFQs — scope, intent, and deadline in one click.

What it does

A costing tool built for how engineers actually work

Not a generic budgeting tool. Not another ERP module. A purpose-built engineering cost estimator that matches process industry workflows.

Plant system hierarchy

Organise your estimate into areas, packages, and individual line items — the same structure your engineers already think in. Reactors, utilities, instrumentation, civil works — anything.

Historical quotation library

Upload previous vendor quotes and let the platform extract pricing data. Every stored quote becomes a reusable basis for future repricing — with full traceability.

Transparent repricing engine

A deterministic 11-step normalization engine adjusts for FX rates, cost indices (CEPCI, Nelson-Farrar), geography, incoterms, quantity, and scope. Every adjustment is shown. Nothing is hidden.

Maturity-linked cost ranges

Estimates are tied to your project stage — Concept, Pre-FEED, FEED, Detailed. The platform applies industry-standard contingency ranges and narrows them as your basis evidence improves.

Live cost dashboard

See total estimated cost, supplier-backed values, awarded commitments, and unquoted exposure in real time. Take a formal snapshot at any milestone to lock in a point-in-time cost position.

Costing-to-RFQ in one click

Select the items that need fresh pricing and convert them directly to a live RFQ. Suppliers receive a structured request. Quotations come back into your comparison view automatically.

Key capability

Your past quotations are your most valuable pricing asset.

Every vendor quote you have ever received — for a reactor, a heat exchanger, a skid package, an instrumentation scope — is a defensible data point for your next project. The Historical Quotation Library lets you store, index, reprice, and reuse them automatically across every future estimate.

How your estimate matures — from concept to procurement

Stage 1±30–50%

Conceptual design

You have a process flow and a rough equipment list. Historical quotes from similar projects give you a defensible order-of-magnitude budget in hours — not weeks of supplier outreach.

Stage 2±20–30%

Basic engineering

P&IDs are firming up and equipment specs are developing. Reprice your library quotes against current CEPCI and FX rates. Request budgetary quotes only where gaps remain.

Stage 3±10–20%

FEED / Detailed design

Datasheets are issued and scope is defined. Layer fresh vendor quotations over your repriced base. The cost range tightens as firm pricing replaces indicative estimates.

Stage 4±5–10%

Procurement

Convert remaining open items directly to RFQs. Received quotations automatically update your cost position. By the time you place orders, your estimate is almost entirely supplier-backed.

As engineering detail increases, you layer fresh vendor pricing over your repriced historical base. By procurement stage, most line items are backed by actual supplier quotes — and your pricing error has collapsed from ±50% to under ±10%.

Upload once, reuse forever

Every quotation you upload — PDF, Excel, or structured data — is extracted, indexed, and available to any future project. A reactor quoted 18 months ago becomes a valid starting point for your next plant.

Automatic normalization

The repricing engine adjusts for currency, cost index (CEPCI, Nelson-Farrar), geography, incoterms, quantity scaling, and date. Every adjustment is shown — nothing is a black box.

Full traceability on every price

Every repriced value carries a documented chain: original quote → supplier → date → normalization factors applied → resulting value. Auditors and project sponsors see exactly where every number comes from.

Know exactly where your gaps are

The cost dashboard separates firm quotes, repriced estimates, indicative values, and unquoted items. You always know which line items need fresh pricing — and which are already defensible.

A real scenario

Your engineering team completed the conceptual design for a new API manufacturing facility. The equipment list has 80 items. You need a CapEx budget for the board within two weeks.

Without ChemCapital: weeks of emailing suppliers for budgetary quotes, compiling spreadsheets, arguing about FX rates, and manually adjusting old prices. Half the items end up as guesses.

With ChemCapital: pull matching quotations from your library, reprice them to today's date and currency in one click, identify the 15 items that genuinely need fresh supplier input, send those RFQs directly from the platform. A defensible, auditable cost estimate in days — with every number traced back to its source.

Stop rebuilding cost estimates from scratch. Start compounding your pricing data.

How it works

From blank project to live RFQ in five steps

A complete, connected workflow — from building the estimate hierarchy to sending supplier quotation requests — without leaving the platform.

01

Create a cost plan workspace

Start a new cost plan — name it, set the project stage (Concept / Pre-FEED / FEED / Detailed), select the target currency, and optionally link it to an existing procurement project. Standalone workspaces are supported too.

chemcapital.io/procurement/costing
Project Costing
New Cost Plan
SRU Phase 2 — Full Plant CapExActiveFEED
47 line items · Updated Today
Utilities Package — HVAC & ChillingDraftConcept
12 line items · Updated 2 days ago
SRU Phase 1 — Archived EstimateArchivedDetailed
34 line items · Updated 4 mo ago
Link a cost plan to a project or use it standalone →
02

Build your plant structure

Add areas, packages, and line items that reflect your actual plant system hierarchy. Each item carries a description, tag number, equipment type, quantity, and technical notes. There is no fixed template — the structure is yours.

chemcapital.io/procurement/costing/sru-phase-2
Plant Structure
FEED ±20%
Area A— Distillation Train
PKG-01 · Distillation Columns
Main fractionator, C3101Vendor quote€ 184,000
Reflux condenser, E3102Repriced€ 62,000
Reboiler, E3103Indicative€ 38,000–56,000
PKG-02 · Pumps & Valves
6 items · 4 priced · 2 indicative
+ Add Area
+ Add Package
+ Line Item
03

Set the pricing basis for each item

For each line item, record the pricing basis: indicative, historical quote, repriced from library, budgetary vendor quote, or firm quotation. Upload the source document, set the origin date and currency, and the normalization engine adjusts it to your target currency and date automatically.

chemcapital.io/procurement/costing/sru-phase-2 · Line Item Detail
Main fractionator, C3101Vendor quote
Basis type
Budgetary vendor quote
Quoted amount
€ 184,000
Original date
Mar 2022
Original currency
EUR
Geography factor
×1.04 (DE→AT)
Escalation index
×1.12 (CEPCI 2yr)
Normalization summary
Original vendor price€ 150,000
+ FX adjustment (EUR/EUR)€ 0
+ CEPCI escalation ×1.12+ € 18,000
+ Geography ×1.04+ € 6,720
+ Manual scope adjustment+ € 9,280
Normalized estimate€ 184,000
Save Pricing Basis
View History
04

Review cost totals and take snapshots

The cost dashboard aggregates everything in real time — total estimated, supplier-backed, awarded, and unquoted exposure. Take formal cost snapshots at every project gate or milestone to create an auditable cost history.

chemcapital.io/procurement/costing/sru-phase-2 · Cost Totals
Cost Totals — FEED Stage±20% accuracy
Total Estimated (supply)
€ 1.24M
w/ contingency: € 1.55M
Supplier-Backed
€ 820K
26/47 items quoted
Unquoted Exposure
€ 430K
21 items still to price
Awarded / Committed
€ 184K
3 items committed
Low: € 1.08MPoint: € 1.24MHigh: € 1.55M
Cost range based on FEED contingency ±20%
Take Snapshot
05

Convert selected items into live RFQs

When you need fresh budgetary or firm pricing, select the relevant line items and generate a live RFQ directly from the cost plan. Received quotations are linked back to the cost plan, so accepted prices update your estimate automatically.

chemcapital.io/procurement/costing/sru-phase-2 · Convert to RFQ
Convert to Live RFQ3 selected
Select the items you need fresh budgetary pricing for. Items with firm quotes are excluded automatically.
Reflux condenser, E3102PKG-01
Reboiler, E3103PKG-01
Feed pump, P3104A/BPKG-02
Main fractionator, C3101PKG-01
RFQ intent
Budgetary Pricing
Response by
15 May 2026
Generate RFQ from 3 Items →

70%

Less time spent on budgetary estimate preparation

100%

Of cost basis changes documented and traceable

2–3 days

To price a 100-item equipment package from historical data

0 spreadsheets

Required to maintain a live project cost position

Who uses it

Built for the process industries

Whether you are budgeting a FEED package, managing a brownfield expansion, or running procurement for a multi-discipline capital project — Project Costing is designed to fit your workflow.

FEED-stage CapEx estimation

Price a full process plant from P&IDs to equipment list. Maintain a transparent, auditable CapEx position from concept through detailed design.

PharmaceuticalSpecialty chemicalsPetrochemical

Brownfield expansion budgeting

Reuse quotations from previous similar projects. Reprice them against current indices and adjust for scope differences — without rebuilding from scratch.

BiotechFood & beverageIndustrial gases

Multi-discipline package management

Organise mechanical, instrumentation, civil, and electrical packages into a single coordinated estimate. Track which items are priced and which are still exposed.

EPC contractorsEngineering consultanciesOwner operators

Procurement handoff

When the estimate matures, convert open items directly to RFQs. Keep the cost plan live through procurement so actual received prices replace estimates automatically.

Project engineersCapEx procurement teamsPlant managers

End-to-end workflow

The complete procurement loop — from estimate to delivered order

Project Costing is not a standalone tool. It is the entry point of a connected procurement platform. Every estimate flows naturally into sourcing, comparison, purchase order, and delivery tracking.

Cost Estimate

Area / package / item hierarchy

Reprice & Refine

Historical quotes + normalization

Convert to RFQ

Selected items → live RFQ

Compare Quotes

AI-scored comparison view

Issue PO & Track

Formal order + milestones

Pricing

Project Costing is included in all Procurement plans.

No separate licence. No add-on fee. Project Costing — along with RFQs, quotation comparison, purchase orders, and order tracking — is included as part of a single Procurement subscription from EUR 99 per user per month.

Free Workspace

Free

1 workspace · 100 line items · after trial

Micro

EUR 99 / user

5 workspaces · 500 items / workspace

Small

EUR 249 / user

15 workspaces · 2,000 items / workspace

Mid-Market

EUR 749 / user

Unlimited workspaces and items

TLS + AES-256 encryption
Sub-second action response
Full audit trail on every change
Deterministic pricing engine

Ready to retire the spreadsheet?

Start your 14-day free trial and see how fast you can build a transparent, auditable CapEx estimate for your next project.

No credit card requiredFree to startCancel anytime

No credit card required. Full Project Costing access during trial.