209 articles

Procurement Insights

Intelligence grounded in evidence for industrial, pharmaceutical, and chemical procurement teams.

Blueprint style graphic of a long pipe run between two anchors with an expansion loop in the middle, and a card showing 122.4 mm of growth over 60 m
Process ExcellenceFor procurement

Pipe Thermal Expansion: Worked Example

How to calculate pipe thermal expansion for carbon and stainless steel, what restrained expansion does, and how loops and expansion joints absorb it.

5 min read
Blueprint style graphic of a shell and tube exchanger piped to a cooling tower, and a card showing 36 cubic metres an hour for a 250 kW duty
Process ExcellenceFor procurement

Cooling Water Flow Calculation: Worked Example

How to calculate cooling water flow from heat duty and temperature rise, then size the cooling tower circulation, evaporation and make up water.

5 min read
Blueprint style graphic of a horizontal tank with dished heads cut away to show a liquid level, and a card showing 9.11 cubic metres at a level of 0.8 m
Process ExcellenceFor procurement

Horizontal Tank Volume When Partly Filled: Worked Example

How to calculate the volume of a partly filled horizontal tank with dished heads, with a worked example and a full dip table you can rebuild in a spreadsheet.

5 min read
Blueprint style graphic of a process skid with a 100 percent tag beside a stack of tax relief bars, and a card showing 125,000 pounds of tax saved in year one
Cost EstimatingFor procurement

Full Expensing for Plant and Machinery: Worked Example (UK)

How full expensing, the annual investment allowance, first year allowances and writing down allowances apply to a £500,000 process skid, with the November 2026 rates.

7 min read
Blueprint style graphic of stores racking holding a seal, an impeller and a motor beside a pump, and a card showing about 7,200 pounds a year to hold the spares
Cost EstimatingFor procurement

Spare Parts Carrying Cost: Worked Example

How to calculate the yearly carrying cost of spare parts, build your own carrying rate and decide which items on a recommended spares list are worth stocking.

5 min read
Blueprint style graphic of a nutsche filter with a cake on the filter plate beside a small lab filter, and a card showing 2.14 square metres of filter area
Process ExcellenceFor procurement

Filter Area Sizing: Worked Example

How to size a batch filter from cake volume and cake depth, read a lab filtration test and scale it to a nutsche or filter press.

5 min read
Blueprint style graphic of a fluid bed dryer with wet cake in and dry product out and vapour rising, and a card showing 336.7 kg of water an hour
Process ExcellenceFor procurement

Dryer Evaporation Load: Worked Example

How to calculate a dryer's evaporation load from wet and dry basis moisture, then the minimum and real heat input, with a worked filter cake example.

4 min read
Blueprint style graphic of a reactor on a delivery trailer beside an empty foundation and a calendar, and a card showing about 51,700 pounds a week of delay cost
Contracts & Post AwardFor procurement

Cost of Late Equipment Delivery: Worked Example

How to calculate the weekly cost of late equipment delivery, compare it with liquidated damages and use it to set a damages rate a supplier can accept.

5 min read
Blueprint style graphic of a skid on a test stand above two dipping cash curves, and a card comparing peak funding of 265,000 and 100,000 pounds
Contracts & Post AwardFor suppliers

Payment Milestones and Supplier Cash Flow: Worked Example

How payment milestones, bonds and retention shape an equipment supplier's cash curve, with a worked example comparing two schedules on a £400,000 order.

7 min read
Blueprint style graphic of a three phase motor with an ammeter on one phase and a card ending in a full load current of 28.0 A
Process ExcellenceFor procurement

Motor Full Load Current: Three Phase Calculation Worked Example

How to calculate a three phase motor's full load current from output, voltage, power factor and efficiency, checked against a real 15 kW data sheet, plus starting current by starting method.

5 min read
Blueprint style graphic of a pump with a variable speed drive, a throttling valve crossed out, and a card ending in 37.6% energy saved
Cost EstimatingFor procurement

VFD Energy Savings for Pumps: Worked Example

How to calculate the energy a variable speed drive saves on a pump using the system curve and a duty profile, why the affinity laws overstate it, and when a drive does not pay.

6 min read