Becoming an Anglian Water Supplier: Alliances, Frameworks and Scanmarket

Who delivers Anglian Water's £11bn AMP8 programme, how it buys directly on Scanmarket, the prequalification it accepts for goods, the Water Innovation Network for new products, and its payment terms.

TC

The ChemCapital Editorial Team

Procurement Intelligence ·

Share
Photograph of flat fenland countryside with a small brick pumping station beside a straight drainage channel and a concrete water tower in the distance, with a navy blueprint panel showing three steps: reach the alliances, quote by invitation, submit new products
Anglian Water's AMP8 work runs through its alliances and a new Major Projects Framework; its own purchases run on Scanmarket, and new products go through the Water Innovation Network. Image credit: ChemCapital

Anglian Water delivers its £11bn AMP8 programme through alliances and frameworks as well as its own purchasing: the @one Alliance has more than 750 projects worth over £3bn in AMP8 [1], alongside the Strategic Pipeline Alliance and the Integrated Operational Solutions Alliance, and since August 2026 a £1.5bn Major Projects Framework held by two joint ventures [2] [3]. For the purchases it makes itself, Anglian Water runs quotations and tenders on its Scanmarket e sourcing platform, often by invitation only [4]. New products have their own door, the Water Innovation Network [5].

ChemCapital is not affiliated with Anglian Water. Becoming its supplier happens only through its own channels, described below, and its supplier pages mention no fee. Checked on 24 November 2026.

Who delivers Anglian Water's AMP8 programme

RouteWhoWhat it means for an equipment maker
@one AllianceAnglian Water, Balfour Beatty, Barhale, Binnies, Mott MacDonald Bentley, MWH Treatment, Skanska, Sweco [1]Over 750 AMP8 projects, so its designers are the people who specify process equipment on those schemes
Strategic Pipeline Alliance and Integrated Operational Solutions AllianceNamed by Anglian Water as existing delivery routes [2]Pipeline and operational work, each with its own partners and supply chain
Major Projects FrameworkFerrovial with MWH Treatment; VolkerFitzpatrick with VolkerStevin, from 27 August 2026 to August 2031, with an option of five more years [3]The largest schemes, starting with coastal water improvement projects worth over £400m [2]

The @one Alliance works on an outperformance model, delivering schemes below Anglian Water's target cost so the savings can fund more work [1]. That shapes what it wants from a supplier: equipment that is cheaper to install and run, with lead times it can trust. Our article on how water companies buy in AMP8 explains how delivery partners choose suppliers.

Anglian Water invites suppliers to its smaller quotations, so being known matters. List your products free on ChemCapital so other buyers can find you by duty, size, material and certification and invite you to quote.

How Anglian Water buys directly

Anglian Water describes three pathways, depending on the value against the thresholds the UK government sets [4]:

  1. Non framework procurement. One off or unforeseen purchases below the threshold, where three quotes are usually required.
  2. Below threshold tender. A request for quotation run on Scanmarket in a single step, by invitation only.
  3. Above threshold tender. A formal procurement that ends in a purchase order or a formal contract.

As of March 2026, its supplier contact page tells bidders to follow current tenders through their Scanmarket account [6]. An October 2026 market engagement notice, however, sent respondents to an Ariba link [7], so check the platform named in each notice rather than assuming one.

Because below threshold quotations are invitation only, the buyer has to know you exist before you can quote. That is the main reason to be visible to Anglian Water's buyers and its partners' engineers well before a requirement appears.

Anglian Water routes for equipment makers: alliances and the Major Projects Framework for capital schemes, direct purchases on Scanmarket for Anglian Water's own needs, and the Water Innovation Network for new products

What Anglian Water checks before it buys

Onboarding starts with a Master Vendor Form, issued when needed. For spend over £35,000, or where the requirement is judged medium risk, further assessments apply as a minimum, set out alongside its Supply Chain Code of Conduct [8].

Health and safety prequalification depends on the risk of what you supply. Anglian Water's contractor prequalification guidance, revised in June 2024, separates goods from services [9]:

Risk of the goodsPrequalification Anglian Water accepts for goods
Negligible or lowNone required
Medium, for example heavy or awkward loads that need mechanical liftingAny one of: Achilles Verify B or A with a 100% result, ISO 45001 certified by a UKAS accredited body, or an SSIP scheme such as CHAS, Safe Contractor or Constructionline
HighVerify B or above, ISO 45001, or an SSIP scheme

Services carry stricter requirements, and where prequalification cannot be completed before award, the supplier must agree to join a suitable scheme within agreed timescales [9]. So a maker delivering a heavy skid with a crane lift needs one of these in place, while a maker posting small parts does not. Our article on Achilles UVDB explains what the Verify audits cost.

New products go through the Water Innovation Network

For a product Anglian Water does not yet use, the route is the Water Innovation Network, a free partnership run by the not for profit Allia with Anglian Water. Any business, organisation or individual can submit a product, technology, idea or service; experts within Anglian Water review it, and suppliers can also respond to challenges Anglian Water has posted [5]. Submit a product there with performance data, not a brochure, and say which Anglian Water problem it solves.

Payment terms and invoices

Anglian Water's filing for October 2025 to March 2026 gives standard terms of 30 days end of month, averaging 45 days. In that period it paid in 59 days on average, and 32% of payments were not made within agreed terms [10]. An earlier filing explains how the terms work: payment at the end of the calendar month after the month the invoice is received [11].

Its supplier FAQs add practical points: quote the purchase order number on every invoice, send invoices to invoices@anglianwater.co.uk, and note that purchase orders older than 18 months that are not tied to an ongoing project are no longer active [12]. Our guide to payment milestones covers how to protect cash flow on larger orders.

Practical example

All figures are illustrative. A UK maker of package pumping stations wants Anglian Water work. It submits its compact pumping station through the Water Innovation Network with energy and maintenance data, and holds ISO 45001 because its stations are delivered with a crane lift, which puts them at medium risk under Anglian Water's guidance. It also introduces itself to the @one Alliance's process designers.

On its first direct order, worth £86,000, it watches the calendar. Under terms of the end of the month after the invoice month, an invoice received on 28 March is due on 30 April, 33 days later, while one received on 3 April is due on 31 May, 58 days later. Moving delivery and invoice forward by six days brings the money in 25 days sooner, worth about £470 at an 8% cost of borrowing, and more if payment runs late.

Being found by the alliances' engineers

The alliance and framework engineers choose much of the equipment on Anglian Water schemes. ChemCapital lists suppliers by what they make: buyers search by duty, size, material and certification and can invite you to quote before you are on their approved vendor list. You can see what a free supplier listing includes.

Ready to be found by the engineers specifying Anglian Water's schemes? List your company on ChemCapital. It is free to start.

Frequently asked questions

How do I become an Anglian Water supplier?

Anglian Water buys directly through quotations and tenders on its Scanmarket platform, with below threshold quotations by invitation only, and onboards suppliers with a Master Vendor Form. Much of its capital equipment reaches it through the @one Alliance, its other alliances and its Major Projects Framework partners, so qualifying with them matters too.

Who is in the Anglian Water @one Alliance?

Anglian Water, Balfour Beatty, Barhale, Binnies, Mott MacDonald Bentley, MWH Treatment, Skanska and Sweco. The alliance has more than 750 projects worth over £3bn in AMP8.

Do equipment suppliers need Achilles or SSIP accreditation for Anglian Water?

It depends on risk. Anglian Water's guidance says goods of negligible or low risk need no prequalification. Medium risk goods, such as heavy loads needing mechanical lifting, need one of Achilles Verify A or B with a 100% result, ISO 45001 or an SSIP scheme; high risk goods need Verify B or above, ISO 45001 or SSIP.

How do I offer a new product to Anglian Water?

Through the Water Innovation Network, a free partnership run by Allia and Anglian Water. Any business can submit a product, technology, idea or service, which experts within Anglian Water review.

What are Anglian Water's payment terms?

Its filing for October 2025 to March 2026 gives standard terms of 30 days end of month, averaging 45 days, meaning payment at the end of the month after the invoice month. It paid in 59 days on average in that period.

Informational only, not procurement or legal advice. Cited names, frameworks, and statistics belong to their respective owners.

Share this article

Send it to a colleague or stakeholder.

Be found by buyers who search by specification

Create your profile and list your products so buyers can find you and invite you to quote. It is free to start: list up to five products and quote on your first three RFQs at no cost.

List your products free

Related articles