Scottish Water SR27 (2027 to 2033) for Equipment Suppliers
Scotland is not in AMP8. How Scottish Water buys equipment for SR27: the £7.9bn final determination, the Enterprise partners who must use its frameworks, the equipment frameworks on its forward plan and how to bid.

Scotland is not part of AMP8. Scottish Water's next investment period, SR27, runs from 1 April 2027 to 31 March 2033, and its regulator, the Water Industry Commission for Scotland, published its final determination on 12 November 2026 supporting £7.9bn of investment [1], 30% more than the current period [2]. For an equipment maker the key fact is this: Scottish Water's delivery partners must use Scottish Water's own supply chain and specialist frameworks [3], and its forward plan lists framework procurements for pumps, valves, dosing equipment, blowers, instrumentation and motor control centres [4]. Those frameworks, tendered on Scottish Water's Atamis portal [5], are the way in.
ChemCapital is not affiliated with Scottish Water. Tendering happens only through Scottish Water's own portal, described below, and its supplier page mentions no fee. Checked on 24 November 2026.
Scotland runs on a different cycle and different rules
Most supplier guides treat the UK water industry as one market. For a supplier, Scotland differs in almost every practical respect:
| England and Wales | Scotland | |
|---|---|---|
| Current investment period | AMP8, April 2025 to March 2030 | SR21 until March 2027; then SR27, April 2027 to March 2033 [2] |
| Economic regulator | Ofwat | Water Industry Commission for Scotland [1] |
| Procurement rules | Procurement Act 2023 | Utilities Contracts (Scotland) Regulations 2016 [5] |
| Where tenders run | Each company's own portal, notices on Find a Tender | Scottish Water's Atamis tender portal [5] |
The final determination caps annual increases in charges at 2.5% above inflation [1]. Scottish Water has until 11 January 2027 to decide whether to accept it [2], so treat the £7.9bn as the regulator's figure until then.
Scottish Water frameworks are tendered one category at a time. List your products free on ChemCapital so other buyers can find you by duty, size, material and certification and invite you to quote in the meantime.
The Enterprise delivers a third of SR27, and must use Scottish Water's frameworks
Scottish Water's largest ever procurement, Delivery Vehicle 4, created the Enterprise: seven partners working with embedded Scottish Water staff against shared outcomes [6] [3]. Scottish Water expects it to deliver a third of SR27 investment [6].
| Role | Partners | Contract value each |
|---|---|---|
| Primary Designers | AECOM, Stantec | £650m |
| Asset Delivery Partners (design and build across civils, infrastructure and MEICA) | M Group Water, Mott MacDonald Bentley, Farrans, WGM Engineering, Ross Shire Engineering | £1.54bn |
Values as reported from the award notice in March 2026 [7]. The term runs to March 2033 with an option of six more years to March 2039 [3].
The sentence that matters most to an equipment maker is in the original notice: successful bidders "will be required to utilise Scottish Waters Supply Chain and Specialist Frameworks" [3]. The same notice says Scottish Water plans, for SR27, a Domestic Subcontract Network and a regional framework for smaller and specialist firms, wider frameworks for materials, plant and specialist water and wastewater equipment, and a review in 2030 that may bring in more partners [3]. In England a maker usually has to win over each contractor; in Scotland the place to win is Scottish Water's own frameworks.

The equipment frameworks on Scottish Water's forward plan
Scottish Water spends about £1.4bn a year with 440 supply chain partners across 184 frameworks; about 70% of its framework suppliers are SMEs and 90% of supply chain spend goes through businesses based in Scotland [4]. Its 2024/25 report lists the procurements it planned to start, with target dates but no values [4]:
| Procurement | Target start |
|---|---|
| Pressure reducing valves | June 2025 |
| CSO screens; screens and screenings handling | August 2025 |
| Trickling filters; static mixers; wash down booster sets; modular pumping stations | November 2025 |
| Remote telemetry units | December 2025 |
| Valves and penstocks | February 2026 |
| Wastewater packaged plant | July 2026 |
| Chemical dosing equipment; the supply of pumps; blowers and compressors; instrumentation; motor control centres and systems integration; bridge scrapers; filtration media | August 2026 |
| Portable and fixed gas detection | May 2027 |
These are targets set in 2025, and some will have moved. Check the tender portal for each category that fits your range, and if a target date has passed without a tender, ask Scottish Water's procurement team whether it is still planned. Frameworks it awarded in 2024/25 show the range it buys directly: low carbon and GRP kiosks, water sampling kiosks, laboratory equipment, glass fused steel tanks and cartridge filters among them [4]. Our guide to framework agreements for pumps, valves and instruments explains how these arrangements are run.
How to bid
- Register on the Scottish Water Tender Portal. Scottish Water runs the whole process there, from advertisement and prequalification to tender and award [5].
- Prepare to sign the Supplier Code of Conduct. All framework suppliers and contractors must [5].
- Plan community benefits. Tenders ask what you will commit to, such as modern apprentices, graduates, jobs for long term unemployed people or work with supported businesses, and the commitments are written into contracts and monitored [4].
- Show how you will support Scottish sites. Nothing requires a Scottish base, but 90% of supply chain spend goes through Scotland based businesses [4], so set out how you will support Scottish sites, for example through a named service partner or engineer in Scotland.
- Answer the prequalification well. Our guide to supplier qualification questionnaires covers the standard sections.
Scottish Water's standard terms are 30 days from receipt of an undisputed invoice, it reported paying 96% of invoices within 30 days, and its contractors must pay their subcontractors within 30 days [4].
Practical example
All figures are illustrative. A pump maker based in the north of England sees "The supply of pumps" on Scottish Water's forward plan. It registers on the tender portal, sets an alert for the category, and prepares a prequalification response with its ISO certificates, reference sites and a service partner in Central Scotland. For community benefits it commits to one modern apprentice over the life of the framework and to work experience placements at its service partner.
When it wins a place and an Enterprise partner calls off a £120,000 order through the framework, the maker's terms on the framework apply. If Scottish Water itself buys spares, its 30 day terms mean the maker is paid a month sooner than under the 60 day terms some English water companies use, worth about £790 on £120,000 at an 8% cost of borrowing.
Being found beyond one framework
A framework place makes you the supplier Scottish Water's partners must use for that category. Buyers outside it, in Scotland and elsewhere, still have to find you. ChemCapital lists suppliers by what they make: buyers search by duty, size, material and certification and can invite you to quote before you are on their approved vendor list. You can see what a free supplier listing includes.
Ready to be found while the SR27 frameworks are tendered? List your company on ChemCapital. It is free to start.
Frequently asked questions
What is Scottish Water SR27?
SR27 is Scottish Water's regulatory and investment period from 1 April 2027 to 31 March 2033. The Water Industry Commission for Scotland's final determination of 12 November 2026 supports £7.9bn of investment, 30% more than the current period. Scotland is not part of AMP8.
How do I become a Scottish Water supplier?
Scottish Water tenders under the Utilities Contracts (Scotland) Regulations 2016 and runs the whole process on its Atamis tender portal, where you register and see current tenders. Framework suppliers must sign its Supplier Code of Conduct.
Who are the Scottish Water Enterprise partners?
AECOM and Stantec as Primary Designers, and M Group Water, Mott MacDonald Bentley, Farrans, WGM Engineering and Ross Shire Engineering as Asset Delivery Partners. The Enterprise is expected to deliver a third of SR27 investment and must use Scottish Water's supply chain and specialist frameworks.
What are Scottish Water's payment terms?
Its 2024/25 procurement report gives standard terms of 30 days from receipt of an undisputed invoice and says 96% of invoices were paid within 30 days. Its contractors must pay subcontractors within 30 days.
Continue reading
Informational only, not procurement or legal advice. Cited names, frameworks, and statistics belong to their respective owners.
Be found by buyers who search by specification
Create your profile and list your products so buyers can find you and invite you to quote. It is free to start: list up to five products and quote on your first three RFQs at no cost.
List your products freeRelated articles

Selling Equipment Into Thames Water in AMP8: Frameworks, Partners and Payment
How Thames Water buys, the Major Projects Framework teams and sites, the £435m Control and Automation framework, and what Thames Water has published about its finances and payment terms.

Selling Equipment Into United Utilities in AMP8: Partners, Goods Frameworks and the Pipeline
The three routes for equipment makers into United Utilities in AMP8: its delivery partners, its direct goods frameworks, and the process equipment market announced in September 2026, with the tenders planned next.

How to Get Your Equipment Specified by Engineers on Process Projects
On process projects the specification and the vendor list decide who gets the RFQ. Here is how specifications are built, from industry standards to owner specs and datasheets, and what equipment makers do to get on them.