Selling Equipment Into United Utilities in AMP8: Partners, Goods Frameworks and the Pipeline
The three routes for equipment makers into United Utilities in AMP8: its delivery partners, its direct goods frameworks, and the process equipment market announced in September 2026, with the tenders planned next.

There are three ways to sell equipment into United Utilities in AMP8: through the delivery partners who build most of its capital programme, through its own goods frameworks for products such as pumping stations, motor control centres and motors, and through a dynamic market for process equipment that it announced on 4 September 2026 and that stays open to new suppliers [1]. United Utilities spent around £1.9bn with about 1,900 suppliers in the year to March 2026 [2], and its published pipeline lists a £30m valves tender planned for December 2026 and a £60m pumps tender for November 2027 [3].
ChemCapital is not affiliated with United Utilities. Its tender documents are free to access, and its tenders run only through its own channels: Find a Tender, its procurement portal and the contacts described below. Checked on 24 November 2026.
Most AMP8 capital work goes through partners chosen in 2024
United Utilities picked its main AMP8 partners before the period began. In June 2024 it named seven partners for more than £3bn of major infrastructure, including upgrades to wastewater treatment works and spill reduction: C2V (a VolkerStevin and Jacobs joint venture), Costain, Jacobs, Murphy, Kier Group, Mott MacDonald Bentley and MWH Treatment [4]. Two weeks later it added 18 detailed design and build partners, ten for network infrastructure and eight for process treatment facilities [5]. By July 2024 it had agreements with 29 partners covering about 85% of the programme [6].
| Partner group | Who | Why it matters to an equipment maker |
|---|---|---|
| Major infrastructure partners, June 2024 | C2V, Costain, Jacobs, Murphy, Kier Group, Mott MacDonald Bentley, MWH Treatment | Major infrastructure including treatment works upgrades, so they specify and buy large process packages |
| Process treatment design and build partners | Avove, bWGM, Eric Wright Water, Ross Shire, Glanua, Lagan Infrastructure, Mott MacDonald Bentley, Stonbury | Process treatment facilities, so process equipment goes into their designs |
| Network infrastructure design and build partners | AE Yates, Barhale, Bethell, Eric Wright Civils, Forkers, Murphy, Network Plus, Sapphire, United Living, Ward and Burke | Sewers, storage tanks and pumping stations in the network |
Each of these firms keeps its own approved supplier list, so getting specified on United Utilities schemes usually means qualifying with them one by one. Our article on how water companies buy in AMP8 explains the chain from regulator to partner to supplier.
United Utilities buys most AMP8 equipment through its partners and frameworks. List your products free on ChemCapital so the partners' engineers and other buyers can find you by duty, size, material and certification.
United Utilities also buys equipment directly, product by product
Alongside the partners, United Utilities runs goods frameworks that it uses directly, and they show where a maker can sell to it without a contractor in between:
| Framework | Awarded | Holders | What the notice says |
|---|---|---|---|
| Supply of submersible pumping stations | 31 March 2025 | Dutypoint, Sustainable Drainage Systems | Stations 2m to 6m deep for emptying sewage detention tanks; covers all of its requirements for this product for AMP8; £3.2m per contract [7] |
| Supply and delivery of MCC panels | 12 September 2025, announced 29 October 2025 | Lloyd Morris, WH Good, RSE, Quantum, Cema, Bridges | Aims include shorter lead times and a suite of modularised products [8] |
| Supply of LV electric motors | 5 August 2025 | Hayley Group, Quantum Controls | Mostly replacements on pumps, screens and conveyors; IE4 efficiency where feasible; distributor supply model at cost plus; £5.6m; awarded on price; six tenders received [9] |
Two lessons follow. First, a framework of this kind can close a product category for a whole regulatory period: the pumping station framework covers all of United Utilities' needs for that product in AMP8 [7]. Second, standardisation rewards whoever is already in. United Utilities told Ofwat it adopted a standard pump from an existing supplier's range, saving over 10,000 hours of design time, and secured a 36% discount on framework prices by committing to volume in advance [6]. Our guide to framework agreements for pumps, valves and instruments explains how these arrangements work from the buyer's side.

What is coming: the pipeline and the process equipment market
United Utilities publishes a pipeline of its planned regulated procurements and asks interested suppliers to email suppliers@uuplc.co.uk [3]. The rows an equipment maker should watch, as listed in November 2026:
| Procurement | Estimated value | Term | Planned to go to market |
|---|---|---|---|
| Supply of valves (and associated services) | £30m | 96 months | December 2026 |
| Supply and commissioning of generators | £9.7m | 36 months | December 2026 |
| Supply and delivery of lime | £6m | 96 months | March 2027 |
| Supply, delivery and commissioning of pumps | £60m | 120 months | November 2027 |
The terms matter as much as the values. A ten year pumps framework placed in late 2027 would run beyond the end of AMP8 in March 2030, so a maker that misses it may wait a long time for the next chance.
The newest route is the dynamic market for process equipment. Its intention notice, published on 4 September 2026, covers goods for both wastewater and potable water equipment, is open ended and stays open to new suppliers, who can apply at any time [1]. As of 24 November 2026 no establishment notice setting out the conditions of membership was listed, so check the procurement page on Find a Tender and apply when it opens. United Utilities now buys under the Procurement Act 2023 and points suppliers to registration on the government's central digital platform, Find a Tender [10]; our guide to finding tenders for process equipment covers that.
How United Utilities judges a bid
Its own page sets out the criteria it typically uses [11]:
- Technical suitability: meeting the specification, track record, research and innovation.
- Financial viability: whether the contract would make you over reliant on United Utilities, and whether your finances can carry it.
- Quality, sustainability and health and safety: certifications, environmental and social record, senior responsibility for safety.
- Whole life cost: a cradle to grave view of every cost tied to the contract.
Questions are scored on a transparent scoring scheme and the highest scoring bidders win. With a new supplier, United Utilities may visit your offices or other customers, and it encourages tested business continuity plans [11]. It uses Achilles UVDB to identify suppliers and asks them to keep their UVDB details correct [11]; our article on Achilles UVDB explains the costs. When you become a supplier you can commit to its Responsible Sourcing Principles as a signatory or, going further, as a leader [12]. On payment, it reported 98% of supplier payments made within 60 days as of March 2026 [2].
Whole life cost is where an equipment maker can stand out against a cheaper rival. Our guide to life cycle cost in equipment quotes shows how to set it out.
Practical example
All figures are illustrative. A UK pump maker wants United Utilities' business in AMP8. It registers interest in the pumps tender through suppliers@uuplc.co.uk, watches for the process equipment market's establishment notice, and in the meantime approaches the eight process treatment partners with a two page submission per partner.
In a partner's enquiry for a sludge transfer duty, it prices its pump against a cheaper competitor over ten years at 4,000 running hours a year and 20 pence per kWh:
| Its pump | Cheaper competitor | |
|---|---|---|
| Purchase price | £18,000 | £14,500 |
| Absorbed power | 11 kW | 12.5 kW |
| Energy over ten years | £88,000 | £100,000 |
| Maintenance over ten years | £12,000 | £15,000 |
| Ten year cost | £118,000 | £129,500 |
Its pump costs £3,500 more to buy and £11,500 less over ten years, which is the comparison United Utilities' whole life cost criterion asks for.
Being found by the partners' buyers
The partners' engineers and buyers decide what goes on most United Utilities schemes, and they need suppliers who can meet each duty. ChemCapital lists suppliers by what they make: buyers search by duty, size, material and certification and can invite you to quote before you are on their approved vendor list. You can see what a free supplier listing includes.
Ready to be in front of the buyers who specify AMP8 equipment? List your company on ChemCapital. It is free to start.
Frequently asked questions
How do I become a supplier to United Utilities?
United Utilities advertises regulated contracts on Find a Tender, uses Achilles UVDB to identify suppliers, and publishes a pipeline of planned procurements with suppliers@uuplc.co.uk as the contact. For AMP8 capital schemes, most equipment is bought through its delivery partners, so qualifying with them is the other half of the route.
Who are United Utilities' AMP8 delivery partners?
In June 2024 it named C2V, Costain, Jacobs, Murphy, Kier Group, Mott MacDonald Bentley and MWH Treatment for major infrastructure, then 18 detailed design and build partners: ten for network infrastructure and eight for process treatment facilities, namely Avove, bWGM, Eric Wright Water, Ross Shire, Glanua, Lagan Infrastructure, Mott MacDonald Bentley and Stonbury.
When is United Utilities' next pumps or valves tender?
Its procurement pipeline, read in November 2026, lists a supply of valves tender worth about £30m over 96 months planned for December 2026, and a supply, delivery and commissioning of pumps tender worth about £60m over 120 months planned for November 2027. Plans can move, so check the pipeline page.
What is the United Utilities process equipment dynamic market?
It is a dynamic market for goods for wastewater and potable water equipment, announced in an intention notice on 4 September 2026. It is open ended and stays open to new suppliers, who can apply at any time once it is established.
Continue reading
Informational only, not procurement or legal advice. Cited names, frameworks, and statistics belong to their respective owners.
Be found by buyers who search by specification
Create your profile and list your products so buyers can find you and invite you to quote. It is free to start: list up to five products and quote on your first three RFQs at no cost.
List your products freeRelated articles

Selling Equipment Into Thames Water in AMP8: Frameworks, Partners and Payment
How Thames Water buys, the Major Projects Framework teams and sites, the £435m Control and Automation framework, and what Thames Water has published about its finances and payment terms.

Scottish Water SR27 (2027 to 2033) for Equipment Suppliers
Scotland is not in AMP8. How Scottish Water buys equipment for SR27: the £7.9bn final determination, the Enterprise partners who must use its frameworks, the equipment frameworks on its forward plan and how to bid.

How to Get Your Equipment Specified by Engineers on Process Projects
On process projects the specification and the vendor list decide who gets the RFQ. Here is how specifications are built, from industry standards to owner specs and datasheets, and what equipment makers do to get on them.