209 articles

Procurement Insights

Intelligence grounded in evidence for industrial, pharmaceutical, and chemical procurement teams.

Blueprint style graphic: a control valve beside a log scale of allowed seat leakage for a four inch valve: class IV about 535 millilitres a minute, class VI 1.7, class V 0.2, with a bubble column for the class VI air test
RFQ & TenderingFor procurement

Valve Seat Leakage Classes Explained: FCI 70 2, API 598 and ISO 5208

What control valve leakage classes II to VI allow, how API 598 and ISO 5208 rate isolation valves, and how to specify shut off in an RFQ so bidders quote the same tightness.

5 min read
Blueprint style graphic: a glass lined reactor, a titanium plate heat exchanger and a PTFE lined valve, each tagged with its wetted material, beside a shipping crate and a globe outline
Risk & ResilienceFor suppliers

Export Controls on Chemical Process Equipment: A Guide for Suppliers

Which reactors, tanks, heat exchangers, columns, valves and pumps are controlled as dual use items, how materials and size decide it, when unlisted items still need a licence, and how to build it into quotes.

8 min read
Blueprint style graphic: a chemical plant of tanks, columns and pipework beside a spend ring split into raw materials, energy, packaging and logistics, indirect services, spares and capital equipment
Process ExcellenceFor procurement

Procurement in the Chemical Industry: Categories, Risks and Capital Equipment

How chemical companies spend, from formula priced feedstocks to spares and capital equipment, where the savings and risks lie in each category, and what leading procurement teams do differently.

7 min read
Stainless steel pressure vessel shell with a dished end resting on turning rolls in a fabrication workshop, with stacks of plate and a plate rolling machine behind
Cost EstimatingFor everyone

Should Cost Analysis for Fabricated Equipment: Vessels and Skids

How to build a should cost model for a pressure vessel or process skid from materials, welding hours, testing, overheads and margin, with a worked stainless vessel example and how to use it.

8 min read
Painted carbon steel pressure vessel on supports in a fabrication shop, set up for a pressure test with a dial gauge and hose on a nozzle, beside a table with a clipboard and torch
Contracts & Post AwardFor procurement

Third Party Inspection for Process Equipment: When to Use It and How to Scope It

What a third party inspector does at your supplier's works, how it differs from a notified body or code inspector, how to pick an accredited agency, and how to scope and price the assignment.

5 min read
Organised process equipment fabrication shop seen from a raised walkway, with stainless steel skid frames under assembly in marked bays, pipe spools on racks and welding bays with fume extraction
Supplier QualificationFor procurement

Supplier Audit Checklist for Process Equipment Fabricators

A practical checklist for auditing a vessel, skid or pipework fabricator before award: what to request in advance, what to check on the shop floor, red flags, scoring and follow up.

8 min read
Blueprint style graphic: a process skid with a pump, vessel and control panel with a padlock, beside a calendar page for 20 January 2027 and an outlined CE mark
Risk & ResilienceFor everyone

EU Machinery Regulation 2023/1230: What Changes for Process Skids in January 2027

The Machinery Regulation replaces the Directive from 20 January 2027. What changes for skid buyers and builders: market placement, modifications, cybersecurity, digital instructions and the GB position.

7 min read
Outdoor process area with explosion protected junction boxes and cable glands on a steel structure, a cable tray, and a motor driven pump beside the pipework
Risk & ResilienceFor procurement

ATEX and DSEAR for Equipment Buyers: Zones, Categories and Ex Marking

How hazardous area zones set the equipment category you must buy, how to read an Ex marking such as II 2G Ex db IIB T4 Gb, why pumps and gearboxes count too, and what to put in the RFQ.

15 min read
Blueprint style graphic: a two by two purchasing portfolio matrix of supply risk against profit impact, with engineered equipment drawn in each quadrant: strategic, leverage, bottleneck and non critical
Process ExcellenceFor procurement

Category Strategy for Engineered Process Equipment: A Step by Step Method

How to build a category strategy for pumps, heat exchangers, vessels, valves and skids: spend and pipeline data, market analysis, Kraljic positioning, sourcing routes and a one page template.

11 min read
Blueprint style graphic: cumulative delay damages on an 850,000 pound order against weeks late: half a percent a week capped at 7.5 percent, one percent a week capped at 10 percent, and the buyer's standby cost rising above both
Contracts & Post AwardFor everyone

Liquidated Damages for Late Equipment Delivery: Rates, Caps and a Worked Example

How liquidated damages for late delivery work in equipment contracts: how UK courts treat them, how to set the rate and cap, what the clause must say, and a worked example with Orgalim terms.

7 min read
Single use bioreactor bags in stainless steel holders with tubing and controllers, beside a conventional stainless steel bioreactor in a clean production suite
Process ExcellenceFor procurement

Single Use vs Stainless Steel Bioprocessing: How to Choose and What to Buy

Where single use beats stainless steel on cost, speed and footprint, where steel still wins, how to compare total cost, and how to buy without supply or leachables surprises.

9 min read