23 articles
Cost Estimating
Articles on cost estimating for industrial procurement teams.

Full Expensing for Plant and Machinery: Worked Example (UK)
How full expensing, the annual investment allowance, first year allowances and writing down allowances apply to a £500,000 process skid, with the November 2026 rates.

Spare Parts Carrying Cost: Worked Example
How to calculate the yearly carrying cost of spare parts, build your own carrying rate and decide which items on a recommended spares list are worth stocking.

Compressed Air Cost per Year: Worked Example
How to calculate the yearly running cost and cost per cubic metre of compressed air from a compressor data sheet, compare fixed and variable speed, and price leaks and pressure.

Pump Total Cost of Ownership: Worked Example
How to calculate a pump's total cost of ownership with the Hydraulic Institute and Europump life cycle cost method, comparing two bids over 15 years in present value.

VFD Energy Savings for Pumps: Worked Example
How to calculate the energy a variable speed drive saves on a pump using the system curve and a duty profile, why the affinity laws overstate it, and when a drive does not pay.

Payback and NPV for a Capital Equipment Purchase: Worked Example
How to calculate simple payback, discounted payback, NPV and IRR for an equipment purchase, and use them to compare two supplier quotes, with a sensitivity check.

Installed Cost Factors for Equipment: Hand Method Worked Example
How to turn equipment quotes into an installed cost estimate with Hand's factors by equipment type, worked through for a small distillation unit and compared with a Lang estimate.

Landed Cost of Imported Process Equipment: UK Worked Example
How to calculate the landed cost of imported equipment in the UK: customs value, duty, import VAT, freight and hidden costs, worked through for one skid quoted from the UK, Germany and Asia.

CBAM and Imported Steel Equipment: Tanks, Fittings and What Buyers Pay
Since 1 January 2026 the EU CBAM charges for the carbon in imported steel goods, including plain storage tanks, pipe fittings and structures. Here is which CN codes are in scope, the 50 tonne threshold, the UK CBAM from 2027 and a landed cost example.

How to Price an Engineered Equipment Quote: Cost Build Up, Margin and Escalation
A worked cost build up for a process skid in pounds: materials with alloy surcharge, fabrication and engineering hours, bought out items, risk, margin versus markup, escalation and validity.

Life Cycle Cost: Comparing Equipment Quotes on Total Cost of Ownership
How to compare equipment quotes on life cycle cost instead of price: the cost elements, what to ask bidders for, discounting, and a worked pump example where the dearer quote wins.

Should Cost Analysis for Fabricated Equipment: Vessels and Skids
How to build a should cost model for a pressure vessel or process skid from materials, welding hours, testing, overheads and margin, with a worked stainless vessel example and how to use it.

The Six Tenths Rule: Scaling Equipment Costs, with Worked Examples
How to scale a known equipment price to a new capacity with the six tenths rule, better exponents by equipment type, and how to bring an old quote up to date.

Cost Risk Analysis: P50, P80 and P90 Estimates with a Worked Example
What P50, P80 and P90 mean, how range estimating and Monte Carlo simulation produce them, a worked three item example, and how owners choose a funding level.

Price Adjustment, Escalation and Currency Clauses in Equipment Quotes
Why long lead equipment quotes carry escalation and alloy surcharge clauses, how the standard index formula works, what to agree, and how to compare a fixed and an adjustable bid.

Equipment Cost Estimating: How to Get Budget Prices for Exchangers, Vessels and Pumps
Five ways to get budget prices before firm quotes, how accurate each can be by estimate class, what drives the price of each equipment type, and a worked example.

Stainless Steel and Nickel Prices: What They Do to Equipment Quotes
How nickel prices flow through stainless steel alloy surcharges into equipment quotes, the latest dated figures, why old quotes go stale, and how to protect an estimate.

Rapid Plant Cost Estimates for Sales Engineers: Days, Not Weeks
How a sales engineer prices an integrated process package in days from historical quotes: escalation, scaling, material and currency adjustments, and a defendable Class 4 budget.

CEPCI: How to Escalate an Old Equipment Quote to Today's Prices
How to bring an old equipment quote up to date with the CEPCI: the index ratio, the six tenths rule, currency for UK buyers and the pitfalls to check first.

Contingency in Cost Estimates: How Much at Each AACE Class
AACE sets no contingency percentage per estimate class. What contingency covers, why it shrinks, how to set it at P50 or P80, and a worked Class 3 example.

Lang Factor Method Explained: From Equipment Cost to Plant Cost
The Lang factor turns a list of equipment prices into a first estimate of plant cost. Here are the factors, the formula, the accuracy and where it goes wrong.

CAPEX Procurement Strategy for Manufacturing Projects
Build a CAPEX procurement strategy that matches package risk and timing to the right market action, supplier engagement model, and cost control discipline.

AACE Estimate Classes Explained for Procurement Teams
Learn how AACE estimate classes help procurement teams match supplier engagement to scope maturity, reduce rework, and run cleaner capital project sourcing.