23 articles

Cost Estimating

Articles on cost estimating for industrial procurement teams.

Blueprint style graphic of a process skid with a 100 percent tag beside a stack of tax relief bars, and a card showing 125,000 pounds of tax saved in year one
Cost EstimatingFor procurement

Full Expensing for Plant and Machinery: Worked Example (UK)

How full expensing, the annual investment allowance, first year allowances and writing down allowances apply to a £500,000 process skid, with the November 2026 rates.

7 min read
Blueprint style graphic of stores racking holding a seal, an impeller and a motor beside a pump, and a card showing about 7,200 pounds a year to hold the spares
Cost EstimatingFor procurement

Spare Parts Carrying Cost: Worked Example

How to calculate the yearly carrying cost of spare parts, build your own carrying rate and decide which items on a recommended spares list are worth stocking.

5 min read
Blueprint style graphic of a screw compressor and receiver feeding an air main with a leak marked, and a card ending in about 43,900 pounds a year
Cost EstimatingFor procurement

Compressed Air Cost per Year: Worked Example

How to calculate the yearly running cost and cost per cubic metre of compressed air from a compressor data sheet, compare fixed and variable speed, and price leaks and pressure.

5 min read
Blueprint style graphic of two pump sets side by side with an iceberg of cost under each, and a card showing bid B about 32,400 pounds cheaper to own over 15 years
Cost EstimatingFor procurement

Pump Total Cost of Ownership: Worked Example

How to calculate a pump's total cost of ownership with the Hydraulic Institute and Europump life cycle cost method, comparing two bids over 15 years in present value.

6 min read
Blueprint style graphic of a pump with a variable speed drive, a throttling valve crossed out, and a card ending in 37.6% energy saved
Cost EstimatingFor procurement

VFD Energy Savings for Pumps: Worked Example

How to calculate the energy a variable speed drive saves on a pump using the system curve and a duty profile, why the affinity laws overstate it, and when a drive does not pay.

6 min read
Blueprint style graphic of a cumulative cash flow curve crossing zero, next to a card comparing two pump bids by payback, NPV and IRR
Cost EstimatingFor procurement

Payback and NPV for a Capital Equipment Purchase: Worked Example

How to calculate simple payback, discounted payback, NPV and IRR for an equipment purchase, and use them to compare two supplier quotes, with a sensitivity check.

7 min read
Blueprint style graphic of a distillation column, exchanger, drum and pumps each tagged with an installation factor, and a card ending in 1.71 million pounds installed
Cost EstimatingFor procurement

Installed Cost Factors for Equipment: Hand Method Worked Example

How to turn equipment quotes into an installed cost estimate with Hand's factors by equipment type, worked through for a small distillation unit and compared with a Lang estimate.

6 min read
Blueprint style graphic of a skid on a container route from a factory to a UK site, with a card comparing landed cost for UK, German and Asian quotes
Cost EstimatingFor procurement

Landed Cost of Imported Process Equipment: UK Worked Example

How to calculate the landed cost of imported equipment in the UK: customs value, duty, import VAT, freight and hidden costs, worked through for one skid quoted from the UK, Germany and Asia.

7 min read
Photograph of three large primed steel storage tanks on timber cradles on a container port quayside, with cranes and stacked containers in the background
Cost EstimatingFor procurement

CBAM and Imported Steel Equipment: Tanks, Fittings and What Buyers Pay

Since 1 January 2026 the EU CBAM charges for the carbon in imported steel goods, including plain storage tanks, pipe fittings and structures. Here is which CN codes are in scope, the 50 tonne threshold, the UK CBAM from 2027 and a landed cost example.

9 min read
Blueprint style graphic of a stacked cost bar for an equipment quote with layers for materials, bought out items, fabrication, engineering, testing, documentation, freight, risk and margin, the margin layer highlighted in amber
Cost EstimatingFor suppliers

How to Price an Engineered Equipment Quote: Cost Build Up, Margin and Escalation

A worked cost build up for a process skid in pounds: materials with alloy surcharge, fabrication and engineering hours, bought out items, risk, margin versus markup, escalation and validity.

9 min read
Blueprint style graphic: two pump quotes as stacked columns of purchase price, energy and maintenance over fifteen years: pump A is cheaper to buy at 18,000 pounds but costs 287,500 pounds to own, pump B costs 24,000 pounds and 270,200 pounds
Cost EstimatingFor procurement

Life Cycle Cost: Comparing Equipment Quotes on Total Cost of Ownership

How to compare equipment quotes on life cycle cost instead of price: the cost elements, what to ask bidders for, discounting, and a worked pump example where the dearer quote wins.

7 min read
Stainless steel pressure vessel shell with a dished end resting on turning rolls in a fabrication workshop, with stacks of plate and a plate rolling machine behind
Cost EstimatingFor everyone

Should Cost Analysis for Fabricated Equipment: Vessels and Skids

How to build a should cost model for a pressure vessel or process skid from materials, welding hours, testing, overheads and margin, with a worked stainless vessel example and how to use it.

8 min read
Chart on log scales of cost against capacity: a 0.6 exponent line rising more slowly than a proportional line, scaling a £60k 10 m³ vessel to £104k at 25 m³
Cost EstimatingFor everyone

The Six Tenths Rule: Scaling Equipment Costs, with Worked Examples

How to scale a known equipment price to a new capacity with the six tenths rule, better exponents by equipment type, and how to bring an old quote up to date.

5 min read
Chart of an S shaped cumulative cost curve over a histogram of simulated outcomes, marking the base estimate, P50, P80 and P90
Cost EstimatingFor everyone

Cost Risk Analysis: P50, P80 and P90 Estimates with a Worked Example

What P50, P80 and P90 mean, how range estimating and Monte Carlo simulation produce them, a worked three item example, and how owners choose a funding level.

6 min read
Chart of labour and materials indices moving between a base date and delivery, beside a price split into 0.10 fixed, 0.35 labour and 0.55 materials
Cost EstimatingFor everyone

Price Adjustment, Escalation and Currency Clauses in Equipment Quotes

Why long lead equipment quotes carry escalation and alloy surcharge clauses, how the standard index formula works, what to agree, and how to compare a fixed and an adjustable bid.

5 min read
A row of new shell and tube heat exchangers and pumps on pallets in a warehouse, ready for dispatch
Cost EstimatingFor everyone

Equipment Cost Estimating: How to Get Budget Prices for Exchangers, Vessels and Pumps

Five ways to get budget prices before firm quotes, how accurate each can be by estimate class, what drives the price of each equipment type, and a worked example.

7 min read
Stacks of stainless steel sheets and coils in a steel service centre
Cost EstimatingFor everyone

Stainless Steel and Nickel Prices: What They Do to Equipment Quotes

How nickel prices flow through stainless steel alloy surcharges into equipment quotes, the latest dated figures, why old quotes go stale, and how to protect an estimate.

4 min read
Stainless steel solvent recovery skid with a packed column, condenser and pumps on a fabricated frame in a fabrication shop
Cost EstimatingFor suppliers

Rapid Plant Cost Estimates for Sales Engineers: Days, Not Weeks

How a sales engineer prices an integrated process package in days from historical quotes: escalation, scaling, material and currency adjustments, and a defendable Class 4 budget.

12 min read
Horizontal stainless steel shell and tube heat exchanger on steel saddles in a fabrication shop, beside stacked stainless steel pipe spools
Cost EstimatingFor everyone

CEPCI: How to Escalate an Old Equipment Quote to Today's Prices

How to bring an old equipment quote up to date with the CEPCI: the index ratio, the six tenths rule, currency for UK buyers and the pitfalls to check first.

7 min read
New stainless steel vessels and a pipe rack being installed beside older storage tanks and a scaffolded column at a chemical plant
Cost EstimatingFor everyone

Contingency in Cost Estimates: How Much at Each AACE Class

AACE sets no contingency percentage per estimate class. What contingency covers, why it shrinks, how to set it at P50 or P80, and a worked Class 3 example.

7 min read
New stainless steel vessels, a heat exchanger and pump skids staged in a laydown yard before installation
Cost EstimatingFor everyone

Lang Factor Method Explained: From Equipment Cost to Plant Cost

The Lang factor turns a list of equipment prices into a first estimate of plant cost. Here are the factors, the formula, the accuracy and where it goes wrong.

5 min read
Mobile crane lifting a stainless steel column into a new plant structure
Cost EstimatingFor everyone

CAPEX Procurement Strategy for Manufacturing Projects

Build a CAPEX procurement strategy that matches package risk and timing to the right market action, supplier engagement model, and cost control discipline.

3 min read
AACE estimate classification table for industrial project costing and procurement timing
Cost EstimatingFor everyone

AACE Estimate Classes Explained for Procurement Teams

Learn how AACE estimate classes help procurement teams match supplier engagement to scope maturity, reduce rework, and run cleaner capital project sourcing.

4 min read