Worked examples
Engineering calculations
39 worked examples for process and chemical engineers, each with the formula, a full set of numbers and the working shown step by step. They cover pumps, heat transfer, piping, vessels, cost estimating and the money side of buying equipment, and each one ends with what the answer means for a datasheet or a supplier quote.
Pumps and fluid flow
7Size the pump, check the suction and work out what the line and the valve take.
Total dynamic head
Works out the head a pump must deliver from static head, pressure difference, line losses and equipment drops.
Pump power: hydraulic, shaft and motor
Works out hydraulic power, shaft power and electrical input, then the motor size for the end of the curve.
NPSH available and required
Works out the NPSH your suction system gives the pump and the margin to ask for over what the pump needs.
Pump affinity laws
Shows how flow, head and power change with speed, and where static head stops the laws from holding.
Variable speed drive energy savings
Works out the energy a drive saves on a pump over a duty profile, and when a drive does not pay.
Pipe pressure drop (Darcy Weisbach)
Works out pressure drop in a liquid line from friction and fitting K values, for 60 m³/h in a 4 inch line.
Control valve sizing: Kv and Cv
Works out Kv and Cv for a liquid control valve in metric and US units, with the choked flow check.
Heat transfer and utilities
5Exchanger area, heating time and what the steam, cooling water and compressed air cost to supply.
LMTD and heat exchanger area
Works out LMTD, the correction factor F and the area of a water cooler, and what a temperature cross does.
Jacketed vessel heating time
Works out heat up and cool down times for a jacketed vessel, glass lined against stainless steel.
Steam consumption for heating a vessel
Works out heat load, mean and peak steam demand and the holding load, and what they mean for valves and traps.
Cooling water flow
Works out cooling water flow from heat duty and temperature rise, then tower circulation, evaporation and make up.
Compressed air cost per year
Works out the yearly running cost and the cost per cubic metre of compressed air, and prices leaks and pressure.
Equipment sizing
4First pass sizes for mixers, filters, dryers and motors, to check a supplier's offer against.
Agitator power and torque
Works out agitator power and torque from power number, speed and impeller diameter, for a 4 m³ vessel.
Filter area
Sizes a batch filter from cake volume and depth, and scales a lab test to a nutsche or a filter press.
Dryer evaporation load
Works out the water a dryer must remove from wet and dry basis moisture, then the heat input it needs.
Motor full load current
Works out three phase full load current from output, voltage, power factor and efficiency, for a 15 kW motor.
Piping, vessels and pressure
4Volumes, expansion, test pressure and relief, the figures that end up on a datasheet.
Horizontal tank volume when partly filled
Works out the volume of a partly filled horizontal tank with dished heads, with a full dip table.
Pipe thermal expansion
Works out how far carbon and stainless steel pipe grows when hot, and how loops and joints absorb it.
Hydrostatic test pressure
Works out test pressure from design pressure under ASME VIII, EN 13445, PD 5500 and B31.3.
Relief valve sizing to API 520
Sizes a relief valve for gas and for liquid, and picks the API 526 orifice letter.
Cost estimating
7From one equipment price to a plant cost, with the allowance for what you do not yet know.
Lang factor method
Turns a list of equipment prices into a first estimate of plant cost, with the factors and their accuracy.
Installed cost factors (Hand method)
Turns equipment quotes into an installed cost with a factor for each equipment type, against a Lang estimate.
Six tenths rule
Scales a known equipment price to a new capacity, with better exponents by equipment type.
Cost escalation with CEPCI
Brings an old equipment quote up to today's prices with the index ratio, and currency for UK buyers.
Contingency in a cost estimate
Sets contingency at P50 or P80 for each AACE estimate class, with a worked Class 3 example.
Cost risk analysis: P50, P80 and P90
Works out P50, P80 and P90 from range estimates on three cost items, and how owners pick a funding level.
Should cost for a fabricated vessel
Builds the price of a stainless vessel from plate, welding hours, testing, overheads and margin.
Whole life cost and finance
7What the equipment costs to own, import and pay for, beyond the price on the quote.
Payback, NPV and IRR
Works out simple and discounted payback, NPV and IRR for an equipment purchase, and compares two quotes.
Pump total cost of ownership
Compares two pump bids over 15 years in present value with the Hydraulic Institute and Europump method.
Life cycle cost of two quotes
Compares equipment quotes on energy and upkeep as well as price, in a case where the dearer quote wins.
Full expensing and capital allowances (UK)
Works out the tax relief on a £500,000 process skid under full expensing and the other UK allowances.
Landed cost of imported equipment (UK)
Works out customs value, duty, import VAT and freight for one skid quoted from the UK, Germany and Asia.
Exchange rate risk on a quote
Works out what a 5% currency move costs between order and final payment, and how to limit it.
Spare parts carrying cost
Works out the yearly cost of holding spares, to decide which items on a recommended list to stock.
Contracts and commercial terms
5Put a number on delay, price movement and cash flow before you agree the terms.
Cost of late equipment delivery
Works out what each week of delay costs you, to set a damages rate a supplier can accept.
Liquidated damages: rate and cap
Works out a rate and a cap for late delivery damages, with an example on Orgalim terms.
Price adjustment formula
Works through the standard index formula, to compare a fixed bid with an adjustable one.
Payment milestones and supplier cash flowFor suppliers
Compares two payment schedules on a £400,000 order, with bonds and retention, from the supplier's side.
Pricing an engineered equipment quoteFor suppliers
Builds a skid price from materials, hours, bought out items, risk and margin, from the supplier's side.
Put the numbers to work
Buying equipment
ChemCapital runs the buying cycle in one place, from RFQs and quote comparison to purchase orders and delivery tracking. 14 day free trial, no credit card.
Start the free trialSelling equipment
Create a free company profile so procurement teams can find you when they search for suppliers.
List your company freeAlso on ChemCapital: Free templates, AI Quotation Comparison, Project Costing and all Insights articles.